PRJ-1042

Arya online store

In progress On schedule E-commerce site design Delivery 29 Shahrivar 1405
See the staging version

What this project needs from you

4 items Nearest deadline: 3 days away

Approve “Product page and basket”

Ready for review on the staging version · due 20 Mordad (3 days away)

12 product photographs still to come

The “Accessories” category · due 20 Mordad (3 days away)

Approve the “Terms and conditions” copy

Draft sent on 14 Mordad · due 22 Mordad (5 days away)

Third instalment invoice — 97.2 million toman

INV-1405-088 · due 25 Mordad (8 days away)

Project pulse

Started 10 Ordibehesht · day 100 of 143

Project health: good
68%

Current stage

Front-end development

Stage 4 of 6 · 75% done

Final delivery

29 Shahrivar 1405

43 days left

Deliverables

17 of 28

2 waiting on your approval

Team

AK MR NS

3 people · Amir Kazemi, project manager

Progress by stage — each block drawn to its share of the project 68%
Complete and approved In progress Ahead

70% of the time spent, 68% of the work done

We are about 3 days behind the timeline. Making that up is planned into this very stage and the delivery date of 29 Shahrivar has not moved.

Rate of progress — one column per week

5 per cent a week on average 3 per cent this week so far

At this rate the remaining 32 per cent takes about six weeks of work, and there are six weeks left until 29 Shahrivar — no slack, but doable. Every approval that arrives early is what builds that slack.

Live preview

The live staging version

Everything the team builds can be seen here before it goes out on the main domain.

Address

aria-shop.niasa.dev

Password (the site is still private)

aria-1405
Open the staging version
Last published
4 hours ago · version 0.9.4
Pages live
18 of 24

Something not right? Log it from “Request a change” at the top of this page and it goes straight to the team.

Stages

3 stages complete · 1 in progress · 2 ahead

17 of 28 deliverables
  1. Analysis and requirements gathering Approved

    10 to 18 Ordibehesht 1405 · 12% of the project

    The kick-off meeting, the requirements document and the exact scope of work were finished and approved by you on 18 Ordibehesht.

    4 deliverables 2 files No extra review rounds
  2. Information architecture and wireframes Approved

    19 to 30 Ordibehesht 1405 · 14% of the project

    The structure of 32 pages, the four main routes to purchase and a first sketch of every page were delivered and approved.

    4 deliverables 2 files 1 review round
  3. Interface design Approved

    31 Ordibehesht to 3 Tir 1405 · 24% of the project

    24 key pages in Figma, in both desktop and mobile, approved after two rounds of review.

    5 deliverables 4 files 2 review rounds
  4. 4

    Front-end development In progress

    Started 5 Tir · estimated finish 24 Mordad · 24% of the project

    Building the pages, the mobile version and the speed work. 18 of the 24 pages can be seen on the staging version right now.

    Progress on this stage 75%
    • The base layout and the home page
    • Product listings, search and filters
    • The product page and its image gallery
    • The basket and the checkout steps
    • The account page and order history — in progress
    • Content pages and the blog — waiting on your copy
    See it on the staging version
  5. 5

    Back-end development and integration Next stage

    Estimated 25 Mordad to 14 Shahrivar 1405 · 20% of the project

    The admin panel for orders and products, the payment gateway and a live connection to your stock system.

    5 deliverables 2 prerequisites from you
  6. 6

    Testing, delivery and training

    Estimated 15 to 29 Shahrivar 1405 · 6% of the project

    Final testing on every browser, the move to the main domain, and a two-hour training session on the admin panel for your team.

    4 deliverables 2-hour training 3 months of free support
Working process

How the project has run

  1. Analysis and requirements
  2. Architecture and wireframes
  3. Interface design
  4. 4Front-end development
  5. 5Back-end development
  6. 6Testing, delivery and training

Money

60% of the contract settled

Paid, of 486 million 291.6 million

Contract instalments

First instalment — 30% deposit

Paid 12 Ordibehesht

145.8m

Paid

Second instalment — 30% on design approval

Paid 8 Tir

145.8m

Paid

Third instalment — 20% on front-end delivery

INV-1405-088 · due 25 Mordad

97.2m

Invoice issued

Fourth instalment — 20% on final delivery

After delivery, Shahrivar 1405

97.2m

Not yet issued
Invoices and receipts

What could still move the date

2 open · both are yours to close

  • Copy for the content pages and the blog Without the copy, two pages of the fourth stage cannot close. A delay of more than 5 days pushes delivery back by about 3 days.
  • API access to the stock system Needed by 25 Mordad for the back-end stage to start on time. You can send the key to the team from here.

Scope of work

Per contract CT-1405-012 and one addendum

  • Design and build of 24 pages, desktop and mobile
  • An admin panel for orders, products and stock
  • The payment gateway and the connection to the stock system
  • Training for your team and 3 months of support after delivery
  • Copywriting, photography and translation
  • Advertising campaigns and specialist SEO (a separate project)

2 change requests on record

One was applied free of charge; the other is in a contract addendum waiting for your signature.

View the contract and addendum